欢呼!十堰这一重大民生工程项目正式获批 建设工期45个月

电子游戏老虎机

Recently, the Shiyan City Development and Reform Commission, the Shiyan Water Conservancy and the Lake Bureau jointly issued《关于十堰市中心城区水资源配置工程生产性试验项目初步设计报告的批复》, which means that the project was officially approved and will officially enter the implementation phase.

The reporter saw in the approval report that the test section was the Pankou intake to the Huohe section of the Pankou Reservoir to the Majiahe Reservoir diversion main canal, with a total length of 4.27 km. The designed water supply flow rate is 6.7m3/s. The total investment of the project budget is nearly 150 million yuan, and the total construction period is 45 months.

febddacef1944d69a28281b455b67111

This also means that after four years, the water from the Pankou Reservoir will flow through the Shiyan City, and the citizens will enjoy more green ecological benefits.

a0e0ab4ff74a4924b65a2fd93df6dad0

fc1d33ede6464513ac4473a7340071c8

dbcb2c02c31b45488e849fa6aff1fc33

caca7000e2ad48d9a5bde6d62ede5a24

2dd0b4d127724ddbacd5c5899e353fb4

d8d13b0df9954838ab71f8eace5b2639

xx